TABLE OF CONTENTS | ||
|
1. |
INTRODUCTION |
|
|
1.1 |
Background and Objectives for the Working Group |
|
|
1.2 |
Temporary Water Management Regime |
|
|
2. |
DESCRIPTION OF EXISTING WATER SYSTEMS |
|
|
2.1 |
Variant C Structures |
|
|
2.1.1 Brief description of structures and status of works |
||
|
2.1.2 Slovak plans for future works near the inundation weir |
||
|
2.1.3 Daily use of the inundation weir |
||
|
2.2 |
Main River |
|
|
2.3 |
Inundation Area on the left Side |
|
|
2.4 |
Inundation Area on the right Side |
|
|
3. |
FORMULATION OF SCENARIOS |
|
|
3.1 |
Outline of the five Scenarios |
|
|
3.2 |
Approach in Assessment of Environmental Impacts |
|
|
3.3 |
Environmental Impacts common to all five Scenarios |
|
|
3.4 |
Assumptions |
|
|
4. |
ELABORATION OF SCENARIO 0 |
|
|
4.1 |
Characterization of the Scenario |
|
|
4.2 |
Technical and Water Management Aspects |
|
|
4.3 |
Possible Time Schedule for Implementation |
|
|
4.4 |
Impacts on Discharges, Water Levels and Flow Velocities |
|
|
4.5 |
Impacts on Erosion/Sedimentation |
|
|
4.6 |
Impacts on Surface Water Quality |
|
|
4.7 |
Impacts on Ground Water Regime |
|
|
4.8 |
Impacts on Ground Water Quality |
|
|
4.9 |
Impacts on Flora and Fauna |
|
|
4.10 |
Impacts on Agriculture and Forestry |
|
|
4.11 |
Impacts on Electricity Production |
|
|
4.12 |
Cost Estimate for Remedial Measures |
|
|
5. |
ELABORATION OF SCENARIO 1 |
|
|
5.1 |
Characterization of the Scenario |
|
|
5.2 |
Technical and Water Management Aspects |
|
|
5.2.1 Additional remedial measures |
||
|
5.2.2 Water management regime |
||
|
5.3 |
Possible Time Schedule for Implementation |
|
|
5.4 |
Impacts on Discharges, Water Levels and Flow Velocities |
|
|
5.5 |
Impacts on Erosion/Sedimentation |
|
|
5.6 |
Impacts on Surface Water Quality |
|
|
5.7 |
Impacts on Ground Water Regime |
|
|
5.8 |
Impacts on Ground Water Quality |
|
|
5.9 |
Impacts on Flora and Fauna |
|
|
5.10 |
Impacts on Agriculture and Forestry |
|
|
5.11 |
Impacts on Electricity Production |
|
|
5.12 |
Cost Estimate for Remedial Measures |
|
|
6. |
ELABORATION OF SCENARIO 2 |
|
|
6.1 |
Characterization of the Scenario |
|
|
6.2 |
Technical and Water Management Aspects |
|
|
6.2.1 Additional remedial measures |
||
|
6.2.2 Water management regime |
||
|
6.3 |
Possible Time Schedule for Implementation |
|
|
6.4 |
Impacts on Discharges, Water Levels and Flow Velocities |
|
|
6.5 |
Impacts on Erosion/Sedimentation |
|
|
6.6 |
Impacts on Surface Water Quality |
|
|
6.7 |
Impacts on Ground Water Regime |
|
|
6.8 |
Impacts on Ground water Quality |
|
|
6.9 |
Impacts on Flora and Fauna |
|
|
6.10 |
Impacts on Agriculture and Forestry |
|
|
6.11 |
Impacts on Electricity Production |
|
|
6.12 |
Cost Estimate for Remedial Measures |
|
|
7. |
ELABORATION OF SCENARIO 3 |
|
|
7.1 |
Characterization of the Scenario |
|
|
7.2 |
Technical and Water Management Aspects |
|
|
7.2.1 Design of underwater weirs |
||
|
7.2.2 Opening of connection to side branches |
||
|
7.2.3 Water management regime |
||
|
7.3 |
Possible Time Schedule for Implementation |
|
|
7.4 |
Impacts on Discharges, Water Levels and Flow Velocities |
|
|
7.5 |
Impacts on Erosion/Sedimentation |
|
|
7.6 |
Impacts on Surface Water Quality |
|
|
7.7 |
Impacts on Ground Water Regime |
|
|
7.8 |
Impacts on Ground Water Quality |
|
|
7.9 |
Impacts on Flora and Fauna |
|
|
7.10 |
Impacts on Agriculture and Forestry |
|
|
7.11 |
Impacts on Electricity Production |
|
|
7.12 |
Cost Estimate for Remedial Measures |
|
|
8. |
ELABORATION OF SCENARIO 4 |
|
|
8.1 |
Characterization of the Scenario |
|
|
8.2 |
Technical and Water Management Aspects |
|
|
8.3 |
Possible Time Schedule for Implementation |
|
|
8.4 |
Impacts on Discharges, Water Levels and Flow Velocities |
|
|
8.5 |
Impacts on Erosion/Sedimentation |
|
|
8.6 |
Impacts on Surface Water Quality |
|
|
8.7 |
Impacts on Ground Water Regime |
|
|
8.8 |
Impacts on Ground Water Quality |
|
|
8.9 |
Impacts on Flora and Fauna |
|
|
8.10 |
Impacts on Agriculture and Forestry |
|
|
8.11 |
Impacts on Electricity Production |
|
|
8.12 |
Cost Estimate for Remedial Measures |
|
|
9. |
CONCLUSIONS AND RECOMMENDATIONS REGARDING TEMPORARY WATER MANAGEMENT REGIME |
|
|
9.1 |
Summary of the five Scenarios and their most important Impacts |
|
|
9.2 |
Conclusions |
|
|
9.3 |
Recommendations by the EC Members of the Working Group |
|
|
10. |
SUGGESTION FOR OPERATION MANUAL FOR TEMPORARY WATER MANAGEMENT REGIME |
|
|
10.1 |
Possible Roles and Functions of Temporary Water Management and Monitoring Committee |
|
|
10.2 |
Operation Manual |
|
|
10.2.1 Monitoring System |
||
|
10.2.2 Description of day-to-day operation |
||
|
11. |
REFERENCES |
|
|
APPENDIX A: |
Terms of References for the Working Group |
|
APPENDIX B: |
Members of the Working Group and the Associate Experts |
|
APPENDIX C: |
Summary of quantitative impacts for different scenarios |
|
APPENDIX D: |
Scenario submitted by the Slovak Expert |
|
APPENDIX E: |
Statement by Ing. I. Uhlar, Ing. J. Frankovsky and Ing. J. Cabel: "Possibility of everyday discharge through inundation weir Cunovo into the old Danube” |
|
APPENDIX F: |
Separate Statement by the Hungarian Expert |